Would be great if there was a way to re-order the channel guide - i.e. not need to have them in channel-code order. — A member replied: “I second this. I just switched from FiOS (back) to Comcast and had forgotten how random their channel numbers are. At least with Fios all our frequent channels were grouped together.”
Would be great if there was a way to re-order the channel guide - i.e. not need to have them in channel-code order.
In sweden for instance a alot of the HD channels are sent on high channel-code numbers -e.g. National Channel 1in HD is sent on channel- code 086 (the SD/original is sent on 001)
Hence, it would be awesome to be able to reorder the guide! (maybe possible to use the standard iOS gui re-arrange function?)
thanks!